SCADA Control

From Mindworks
Jump to: navigation, search
[[File:[[File:|thumb|300px|left]]|300px|center|alt=]]
Sponsors
Team Name SCADA Control
Duration Semester Year - Semester Year
Faculty Adviser
  • Beleed Hussain
Mentor
  • Brian Johnson
Client
  • Brian Johnson
Team Members
  • Kevin King
  • Hui Ma
  • Ziang Xu

Purpose[edit]

(1) Learning the principle and operation of Synchronous motor generator and SCADA Control system.
(2) Using PC software (which is little relative to the Programmable Logic Controller) to control the rotation speed of the generator.
(3) Able to adjust speed and frequency of the motor,and show the rotate frequency of the Synchronous motor in the scope successfully.

Background[edit]

The UI Department of Electrical and Computer Engineering laboratory facilities include an analog model power system (AMPS) that is capable of simulating interaction of control and protection hardware in a network with up to five lines transmission line segments. The system protection hosts a full complement of commercial protective relays and a fault generator capable of initiating common fault types with any fault impedance and any duration. Multiple generation sources can be interfaced with the system including synchronous machines, a doubly fed induction generator and power electronically coupled generation.The facility shown in Figure 1 is used for labs for several power systems courses as well as for research projects.

S12.png


The model power system has controls to control a synchronous generator for manual synchronization to the Avista system through the building power supply. The manual controls include push buttons for start and start and potentiometers to control speed and terminal voltage as shown in Figure 1. The potentiometers regulator a dc control signals for the MG set. There is also a synchroscope for visual indication to determine when to manually close the circuit breaker. While the circuit breaker can be remotely controlled through a supervisory control and automation (SCADA) interface, the machine itself cannot be controlled through SCADA.

Equipment Information and Data[edit]

S5.png

S6.png

S7.png

S11.png



Test Bench Power up Instructions[edit]

S8.png

Turn on Breakers in the picture.


S9.png

On panels, open all breakers (should be green color).
Flip on Aux Power Supply, Fault Matrix, and DC Power Supply switches.

S10.png

Press MG Set Start button.
Synch up MG set to grid using the Volt and Speed potentiometer to match voltages and adjust speed and close breaker just before synchroscope is at 12 O-Clock.



MG Set Control Connections[edit]

S1.png

S2.png

S3.png

S4.png



Team Information[edit]

Dr. Johnson.jpg
Brian Johnson

Responsibility:
Email:'bjohnson@uidaho.edu'

[[File:|150px|thumb|left]] Beleed Hussain

Responsibility:
Email:'bele5082@vandals.uidaho.edu'

Kevin King.jpg
Kevin King

Major:'EE'
Hometown:'U.S'
Responsibility:'Team leader and in charge of budget'
Email:'king5295@vandals.uidaho.edu'

Hui Ma.jpg
Hui Ma

Major:'EE'
Hometown:'China'
Responsibility:'Organize team meetings'
Email:'hui4252@vandals.uidaho.edu'

Ziang Xu.jpg
Ziang Xu

Major:'EE'
Hometown:'China'
Responsibility:'Team meeting recorder and keep team documentation'
Email:'xu4962@vandals.uidaho.edu'




Additional Documentation[edit]

Project Schedule

File:Schedule-Template Fa-Sp.pdf

Meeting Minutes

File:SCADA-Control-Meeting-Record-1.pdf
File:SCADA-Control-Meeting-Record-2.pdf
File:SCADA-Control-Meeting-Record-3.pdf
File:SCADA-Control-Meeting-Record-4.pdf
File:SCADA-Control-Meeting-Record-5.pdf
File:SCADA-Control-Meeting-Record-6.pdf
File:SCADA-Control Meeting Record 7.pdf

Presentations

File:Team-Contract.pdf
File:Budget.pdf


Client Interview

File:Client interview Transcript.pdf