Talk:AMPS Communication

From Mindworks
Jump to navigation Jump to search

Mentor Comments from 5/14/14[edit source]

Problem Definition
  • List the equipment needed as determined by your team and any required specifications for that equipment.
  • Provide a hyperlink for "GOOOSE" protocols defined by the IEC 61850 standard.


Project Responsibilities and Design Goals
  • Looks good. Clear description of the devision of tasks as the project progressed. Design Goals are laid out in clear and chronological order.


System Setup
  • Well documented. Key design aspects are mentioned and design solutions are justified with reasonable arguments.


System Architecture
  • Design validation is explained and various aspects of final design are mentioned.
  • Could benefit from a more specific explanation of final design choices. Possibly through the use of graphics or photos.


Team Members
  • Good consistent format.


Documents
  • Feel free to add any additional documents to help future students replicate the project or build upon your work, i.e. hardware schematics, spec sheets, useful code.

Jonathan Teske (talk) 04:41, 15 May 2014 (UTC)